25 kW photovoltaic installation grid-connected

Customer needs
The Puerto Deportivo de Marbella wanted to reduce its electricity bill and had a free surface on the roof that could be used for the solar panel’s installation.
What did we do?
After a technical visit where we learned about the client’s facilities and needs, we draft a study of the requested photovoltaic plant production, including the annual savings estimation.
Once we presented this study to the client and received their approval, we carried out a load study to verify the feasibility of the installation and draft the installation technical project. We take care of the entire installation and the necessary steps to put the photovoltaic plant into operation with the compensation of surpluses from start to finish.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Installation process